Explain the importance of routine maintenance to a mud system.
#1 Routine maintenance can extend the life of not only the complete mud system but also individual components and prevent premature failure of the unit. This is also a great time to inspect the unit for stressed or damaged components.

Is this apiece of equipment that gets overlooked in general maintenance?
#2 When the mud system is operating properly it is easy to forget to check and grease components as a preventative measure. The focus on a jobsite is to increase production while decreasing operating cost. While this makes for a better bottom line (on the books), it does not always allow for the time or personnel to maintain and repair the equipment. For this reason as they say “the squeaky wheel get the oil” and if it is running we have a tendency to focus on the larger problems of keeping the drill bit turning.

Purchased new, what is the general lifespan of a mud system? What factors impact this age?
#3 This is a hard question to answer due to variables such as location of service (ex: heavy sand areas verses slow hard rock drilling or shale). The amount of time per day the unit is used: 12 hour vs. 24 hour per day jobs. Number of days per week and number of weeks per year the unit is used. We have units built in 1996 that are in use today and still going strong. We also have had units with less than five years service (hard service) that require refurbishing and upgrading.

Please offer some general maintenance tips for readers and explain why they are necessary and contribute to a longer system lifespan.
#4 Always check the oil and water on the power unit at least once a day. Change the oil and filters as recommended, more often in dirty conditions. Make sure there is adequate pressure on the cones while drilling to ensure optimum cleaning and always make sure the screens are sized correctly and in good condition.

What mistakes to contractors make in the upkeep of their mud system?
#5 General mantaince on a recycler is fairly straightforward and I believe most contractors want their systems to last a full lifetime. One area I have seen that could be improved is overall clean up after the job is finished. Wash the machine to remove all mud and debris. Flush clean water thru the system to clean out all the suction and discharge lines. This prevents drilling mud from drying in the suction line, cones, hopper, etc.

Are there any weekly, monthly, post-job items that they should always include?
#6 Visual Inspections of the frame, electrical and or hydraulic components.

What effect does the normal wear-and-tear usage does a mud system have on the machine?
#7 The dirty fluid flowing thru the mud system is effectively sand blasting away the interior of the pipes, steel, etc. Wear items such as the hydrocyclones, centrifugal impellors, wear plates and volutes are designed to process the undesirable fluid and will over time have to be replaced. As these items wear the efficiency of the unit will diminish. This means the maximum cleaning capacity will diminish.

Anything else you would like to add about preventative maintenance of the mud system?
#8 “An ounce of preventative is worth a pound of cure!” If properly maintained a mud recycling system can remove the undesirable solids from your drilling mud. This will save not only the wear items on the mud system but also increase the life of the drilling rig: swivel, pipe, downhole tools, etc. In addition it will allow you to reuse your drilling mud cutting cost on water, bentonite and labor.

______________________________________________________________________________________

MUD TECHNOLOGY INTERNATIONAL INC.
Mud Technology International, Inc. is dedicated to producing the highest level of quality and durability in all of the systems we manufacture. Our engineering staff can design or modify any of our machines to meet our customer’s particular need. In as much, it is our goal to provide our customers with the ultimate in customer service. If we can help minimize or eliminate downtime, then that will allow our customers to operate at maximum efficiency which translates into big savings for them.
We manufacture a complete line of shakers; desilters, desanders and mud pump packages, thus allowing us the ability to maintain a higher standard of excellence. Our tank and mixing systems are designed for maximum flexibility and we carry parts for all major brands of equipment.


How Our Equipment Operates

Our equipment is normally set-up on location and used to mix the Bentonite Slurry solution used to float the cuttings out of the tunnel and cool the drilling surface while cutting.

The fluid is collected at a central point from the tunnel and transferred to the mud system for processing. The mud system will process the fluid in stages.

The returned fluid is pumped over the “Scalping Shaker” removing all the large and mid-sized particles from the system.

Next (depending of the size of the recycler) the fluid is collected by a centrifugal pump and processed thru either a DeSander cone bank (large units) or a straight to a DeSilter cone bank (small to mid-size).

Note: on the larger systems the fluid is processed thru a DeSander cone bank first due to the shear amount of volume then is sent to a DeSilter cone bank. On the “mid-sized to small” units the DeSander cone bank is eliminated and the DeSilter cone banks are increased in capacity to compensate.

We normally use 10″ DeSander cones and 5″ DeSilter cones on our units. Other sizes are available for different applications.

The size of the cones will dictate the “cut-point” (size) of the solid that the cone will remove along with the volume the cone will process. The cones can be mounted over a shaker to further “dry” the cuttings prior to depositing for removal.

The “Cleaned” fluid is collected in the final tank where it can be thickened or thinned as necessary to meet the contractors’ requirements. This is accomplished by using a venturi style mud hopper and submersible jet stirring guns to “Shear the fluid”.
Finally a centrifugal pump can be used to pressure feed the cleaned and processed fluid back to the tunneling operation for reuse.

I hope this helps to explain some of the workings of our units.


Upcoming Trade shows


Offshore Technology Conference -  May 2-5, 2011 – Houston, Texas

Founded in 1969, the Offshore Technology Conference is the world’s foremost event for the development of offshore resources in the fields of drilling, exploration, production, and environmental protection. OTC is held annually at Reliant Center in Houston.

Each year, OTC attracts more than 60,000 attendees and 2,000 exhibiting companies representing more than 110 countries.

OTC is sponsored by 12 industry organizations and societies, who work cooperatively to develop the technical program. OTC also has endorsing and supporting organizations.

Check out the OTC website for more details.


Let’s Keep it Running and Make Some Money-Equipment Maintenance

By: John Miller, CEO, Mud Technology International, Inc.

Athens, Texas USA

Equipment maintenance is a topic that no contractor particularly wants to address, but
in light of the ever growing need to maximize production and cut “down time” it is extremely important. Your equipment will only continue to work properly if you take the time to perform simple routine maintenance.

Not only will routine maintenance extend the life of the complete mud system, but will also extend the unit’s individual components which in turn, assist in the prevention of premature failure of the unit. General maintenance on a recycler is fairly straightforward, and can substantially prolong the life of the equipment. Important maintenance items to remember are:

  • Check the oil and water on the power unit at least once a day.
  • Change the oil and filters as recommended, but keep in mind that they will require more attention when drilling in abnormally harsh drilling conditions.
  • Make sure there is adequate pressure on the cones while drilling to ensure optimum cleaning. Test the bottom of each cone with your finger to feel for a vacuum or suction action while running.
  • Take the time to ensure proper screen size selection and that the screens are free of tears and in good condition.
  • Conduct routine visual Inspections of the frame, electrical and/or hydraulic components.
  • Periodically inspect wires, hoses and connections to identify any damaged items that should be replaced.
  • Keep electrical boxes closed and caps on hydraulic or fuel tanks. To date, we have not been able to make the machine run better or faster using water for fuel or hydraulics. This can be a serious mistake and cost a large amount of money to repair, not to mention downtime. As a side note to this, “Do not use a screwdriver” as an electrical start button! More than once we have found a flat blade screwdriver wedged into an electrical starter holding the contacts together. The electrical panels do not need to be left open for any reason while running.
  • Tires, axles and lug nuts should be inspected and adjusted as needed as well as the brakes.
  • Remember to check the 12 volt lighting on trailer mounted units to maintain a safe “over the highway vehicle.”
  • And, always ensure that the safety guards are in place. It is necessary that we all take responsibility to ensure safety on the location and when time is at a premium it may seem easier to leave items off after a repair. The few extra minutes it requires to reinstall the guard may make the difference in preventing a serious accident.
  • Take the time to remember to grease and adjust centrifugal packing on a regular basis. A leak will not only cause a mess but also hazardous work environment. Bearings require lubrication for long life. Refer to your owner’s manual for all the grease points located on your unit. Electric motors do not require regular grease. Check with the manufacturer on their requirements. Cones can get plugged with debris making them inactive thus reducing their cleaning capacity. Screens get torn allowing trash to get into the system causing plugging problems. Oil or drilling mud on the deck floor can cause “slip” hazards.

When it is time to move the equipment from one location to another, take a few minutes and thoroughly wash the machine to remove all mud and debris. Flush clean water thru the system to ensure that all suction and discharge lines are clean and clear. Completely flushing the system can prevent drilling mud from drying in the suction lines, cones, hopper, etc. Remember; in extreme weather conditions be sure to winterize the system. Refusal to do this can result in trouble restarting the cleaning system and a great amount of time and expense to clean out when you should be drilling.

While performing the clean-up inspect the unit for any stressed or damaged components. When the mud system is operating properly it is easy to forget to check and grease components as a preventative measure. The focus on a jobsite is to increase production while decreasing operating costs. While this makes for a better bottom line (on the books), it does not always allow for the time or personnel to maintain and repair the equipment. For this reason, as they say, “the squeaky wheel get the oil” and if it is running we have a tendency to focus on the larger obvious challenges of keeping the drill bit turning.

I am often asked “What the general lifespan is of mud system when purchased “new” and what factors impact the age?” This is a hard question to answer as there are so many variables that you must take into consideration. For example, the location of service (ex: heavy sand areas vs. slow hard rock drilling or shale),amount of time per day the unit is used (12 hour vs. 24 hour per day jobs),number of days per week and number of weeks per year the unit is used all must be evaluated. What I normally tell contractors is we have units that were built in 1996 that are still in use today and still going strong. We also have had units that had a life of less than five years of service (hard service) that have required refurbishing and upgrading. You must keep in mind that maintenance and conscientious personnel running the equipment will increase the lifespan of any piece of equipment. If you operate in extremely harsh conditions, abuse, or neglect any equipment without conducting routine inspection and maintenance it will not be operating for the long haul! With that said, remember the dirty fluid flowing thru the mud system is effectively sand blasting away the interior of the pipes, steel, etc. Wear items such as the hydro cyclones, centrifugal impellors, wear plates and volutes are designed to process the undesirable fluid and over time must be replaced. As these items wear out the efficiency of the unit will diminish and that means the maximum cleaning capacity will diminish. As Ben Franklin once said “An ounce of prevention is worth a pound of cure.” I keep trying to live by that and instill those words of wisdom by telling field personnel and customers that if properly maintained a mud recycling system can effectively remove the undesirable solids from your drilling mud. This will save not only the wear items on the mud system but also increase the life of the drilling rig: swivel, pipe, and down hole tools. You will become more cost efficient by permitting the reuse of your drilling mud thereby cutting costs on water, bentonite and labor.

Take a minute, step back and give a hard look at any mud system and we will all have to agree on at least one (1) thing, mud systems have a lot of moving parts that must be maintained in order to keep them in premium working order. Training your drilling crew and maintenance personnel to take the time to properly set-up, run, maintain and troubleshoot equipment challenges will not only save time and money but will ensure the long life of the drilling/recycling equipment.